The Brangus HM-II Bridge Plug is set using hydraulic force to set the top slips and then mechanical pull to complete the set. The Model HM-II is for high pressure and temperature.
The need for a mechanical setting tool does not exist because the setting mechanism is built-in. A ball is placed in the tubing string plugging off the built-in equalizing ports. Pressure is then applied to set the top slip and then mechanical pull is applied to finish the set. Releasing the tubing string from the plug is done by simply turning to the right.
Full tubing I.D. is available after releasing from the plug allowing other equipment to extend through the end of the tubing string.